CNC straight-line cutting (shearing) → Rolling/Bending → Automatic welding → Flange fitting → Pipe flanging → Pickling → Quality inspection → Packaging → Pre-shipment verification
Pipe prefabrication must be carried out in strict accordance with the requirements of SH/T3517-2001. Before prefabrication, the piping layout drawings, detail drawings, and pipe spool drawings must be carefully verified to avoid unnecessary rework.
1. Pipe Cutting
⑴. Cutting must be performed strictly according to the design isometric drawings; material dimensions must be carefully checked prior to cutting. CNC shearing is used for straight-line cutting (tolerance: ±0.1 mm).
⑵. Material layout should be optimized based on pipe lengths to minimize waste. For pipes with low quantities, large diameters, thick walls, or special materials, a comprehensive layout plan should be created before cutting to strictly control material usage. Cut-offs exceeding 100 mm in length must not be treated as scrap; they should be logged and stored by material type for future use.
⑶. If the original identification marks on the pipe are destroyed during cutting, the marks must be replicated on the remaining pipe section. Refer to Appendix 4 for material identification requirements.
⑷. Stainless steel pipes must be cut using mechanical or plasma methods, while other pipes may be cut and beveled using oxy-fuel (flame) cutting. Cut surfaces must be smooth and free from cracks, laminations, burrs, irregularities, or necking; slag, oxides, and iron filings must be removed promptly.
⑸. The inclination deviation (△) of the cut end face must not exceed 1% of the pipe's outer diameter, nor exceed 2 mm.
2. Beveling Requirements
Piping connections are primarily made via welding, for which beveling is a prerequisite; this process must comply with relevant standards. A V-shaped bevel is used for medium- and low-pressure piping, while a YV (double-V) bevel is used for high-pressure piping. Bevel surfaces must be smooth and free from cracks, laminations, burrs, and iron oxides; an angle grinder must be used to grind the bevel and the adjacent 10 mm area to a bright metallic finish. Specific weld bevel configurations shall be executed in accordance with the Welding Procedure Specification (WPS).
3. Weld Joint Fit-up
Before pipe fit-up, clean the inner and outer surfaces of the joint ends (within a 25mm range) to remove dirt, oil, rust, and other contaminants; use a wire brush or swab to remove debris from inside the pipe. For pipe sections left open during prefabrication and installation, measures must be taken to seal the ends and prevent debris from entering the pipe.
4. Prefabrication Permissible Deviations:
⑴ Perpendicularity between flange face and pipe centerline: 0.5mm for DN < 100; 1.0mm for 100 ≤ DN ≤ 300; 2.0mm for DN > 300.
⑵ Dimensional deviation: ±10mm for free pipe sections; ±1.5mm for closed (tie-in) pipe sections.
When aligning pipe ends, measure straightness at a point 200mm from the center of the joint:
For DN < 100mm, a < 1mm; for DN ≥ 100mm, a < 2mm; however, the total length deviation must be less than 10mm. Specifically, the permissible deviation value 'a' is 1mm for nominal pipe diameters less than 100mm, and 2mm for nominal pipe diameters equal to or greater than 100mm; however, the total length deviation shall not exceed 10mm.
5. Prefabricated pipe components shall be numbered according to requirements (including pipeline number, weld joint number, and welder ID) to facilitate quality control and identification during installation.
6. Upon completion of prefabrication, the interior of the pipe sections must be cleaned, and the ends sealed promptly to ensure internal cleanliness. It is specifically required that all pipe ends be sealed prior to installation, ensuring 100% sealing of prefabricated piping upon arrival at the site.
7. For butt-welded joints of pipes with equal wall thickness, the inner walls must be aligned flush; the internal misalignment (high-low) should not exceed 10% of the wall thickness and must not exceed 2mm.
8. When fitting up piping components of unequal thickness, if the internal wall misalignment exceeds 1.5 mm or the external wall misalignment exceeds 3 mm...
9. Requirements for spacing between adjacent welds:
Spacing between circumferential weld centerlines: ≥150 mm for DN ≥150 mm; ≥pipe outer diameter for DN <150 mm;
Spacing between the nearest points of longitudinal welds: ≥5 times the pipe wall thickness;
Spacing between the opening for a branch connection and the nearest point of a circumferential or longitudinal weld on the header pipe: ≥3 times the header pipe wall thickness.
10. When lugs or supports are welded to the pipe, the welds for these supports or lugs must not cross over the pipe or pipe fitting welds.
11. Requirements for tack welds and welds for fixing clamps during fit-up are the same as those for production welds.
12. When removing fixing clamps, do not knock them off directly with a hammer; use a grinder or gas cutting torch. Flame cutting is restricted to the outer layer of the weld; the portion in contact with the base metal must be removed by grinding. If defects are found, they must be repaired and pass a liquid penetrant test.
13. Weld surfaces must be free of cracks; welds must be free of defects such as lack of fusion and incomplete root penetration. Undercut depth must not exceed 0.5 mm, and the total length of undercut within any 300 mm continuous weld section must not exceed 50 mm. Weld surfaces must be free of localized clusters of porosity, individual pores, and slag inclusions.
14. After welding, promptly remove slag and spatter from the weld surface and perform a self-inspection of the weld surface quality.
15. Welded joints on stainless steel ducts and fittings must undergo pickling and passivation; treat the joint surfaces with a pickling and passivation solution (or paste) specifically designed for stainless steel to remove oxides formed during welding.